Connect with us

NEWS

NASS complex Renovation: Clerk issues relocation notice to lawmakers

Published

on

Establishment of the Federal University of Transportation Daura gets senate's approval

 

The office of the Clerk to the National Assembly has notified Senators and House of Representatives members to relocate from their main chambers to temporary venues for plenary as the contractor handling the renovation of the National Assembly Complex resumes work.

A statement issued on Friday by Special Adviser on Media and labor to the Clerk to the National Assembly Adesoro Austen stated that as the renovation commenced Senators will temporarily conduct plenary at Committee Room 022 on the ground floor of the New Senate Building, while the House of Representatives members will use spacious Committee rooms on the ground floor of its new wing as a plenary venue.

According to the statement, the contractor has 16 months to execute the job with an alternative arrangements in place for the plenary.

“Members of House of Representatives are expected to utilize the halls on the first and second floor of the House of Representatives new building.

“There is also a plan to use teleconferencing technology to link all lawmakers who may not be able to find seats at the Committee Room on to the ground floor.

The statement indicated that the contractor handling the renovation project officially took over the Complex on Wednesday.

In his brief remarks at the official handing over ceremony of the Complex to the contractor handling the project, the Executive Secretary of the Federal Capital Development Authority (FCDA), Engr. Shehu Hadi Ahmad, represented by the acting Director of Public Buildings, Arc. Adebowale Ademo, listed the scope of work to be carried out during the renovation.

Adebowale said: “The renovation will comprise the two plenary chambers of the National Assembly as well as the office buildings housing the office accommodation for the Senators and Honourable Members of the House of Representatives.

“The scope of what is to be done in this phase one of the works entails making the roof watertight. There have been several inconveniences of roof leakages experienced in the past and one of the major areas of attention is to redress the roof leakages and make the entire roof of the White House watertight.

Read Also >> Qatar 2022: Senate Invites Sports Minister, NFF President Over Vandalisation Of MKO Abiola Stadium

“Next is the cooling system. Some of the Committee Rooms and central lobbies have faced challenges of temperature regulation because some of the chillers are out of service.

“The contract entails the replacement of some of the chillers and rehabilitation of those that are in good condition to make them to work properly.

“We also have as part of the scope the replacement of lifts that are inoperable in the White House as well as in the House of Representatives and in the new Senate Wing.

“Beyond that also, work will be done in the toilet areas to make sure the plumbing and the equipment and fittings are in proper condition.

“In addition, work will be done to address challenges of the extra low voltage equipment, the public address system and the fire safety installations.

“These works will entail rehabilitation and upgrading to make them state of the art and ready for use looking at today’s technology.

“Most critical of all, in terms of what needs to be done, is the reconfiguration and the upgrading of the two chambers of the National Assembly.

“This reconfiguration works involve extending the sitting terraces to provide more comfortable sitting and also provide a worktop where the legislators can sit and work in a very comfortable manner.

“Beyond that also, the entire ambience of the space is going to be transformed and we are hopeful that at the end of the works, we will have a new and very efficient working environment for our Distinguished Senators as well as the respected Honourable members of the House of Representatives.

“In a nutshell, this covers the essential scope of what needs to be done and what is going to be done during this renovation works.

“Like I said earlier, it is a major intervention. It is comprehensive and the intention is to restore this building to its original status and also to upgrade it so that the facilities and equipment therein will match any in any parliament in the world.”

On his part, the Clerk to the National Assembly, Arc. Ojo Olatunde Amos, who was represented by the Secretary Estate and Works, Engr. Bashir Yero, said the National Assembly Complex will remain a place to be in terms of legislators’ comfort after the renovation.

The CNA said the renovation of the National Assembly was long overdue as the new face of the complex when completed will give a physiological boost to lawmakers, staff, and visitors including Parliamentary reporters.

“We believe by the time this project is completed, the National Assembly will certainly be a place to be in terms and our legislators will be more than happy to have an enhanced environment, especially the chambers.

“What we have in chambers has not been too good for legislative comfort. You see the legislators having to go out once in a while and then they have to disturb a lot of their colleagues along with that roll.

But with what we have now in the review that will not happen again. The seats will not only be comfortable for them, there is going to be a connection to the internet.

“Eventually, it is going to be a mini-work station so that while they are seated in the chamber they will be virtually connected to the entire world and by this we can match any parliament in the world.”

The Managing Director of the firm handling the renovation, Messrs Visible Construction Company Nigeria Limited, Olalekan Adebiyi, said the work would be done speedily.

Adebiyi said: “We are ready to move with good speed. We are ready to work day and night because we know that challenges ahead.

“Everything we have to do, talking about the chambers, we have to do fast considering the fact that the legislators have to vacate the main chambers to a temporary place for us to work.

“So we know what it is and we are ready to face the challenge and do whatever we have to do very fast so that we can deliver in a good time. So we are ready.”

NEWS

Panic as Fire Razes 12 Shops in Kwara Shopping Complex

Published

on

Panic broke out in the Mandate Market area of Ilorin, Kwara State, after a fire engulfed parts of a shopping complex in the early hours of Saturday.

No fewer than 12 shops were affected in the inferno, which occurred opposite Alkad Filling Station at about 1:14am.

The shopping complex, which contains about 40 shops, was already engulfed in flames when firefighters arrived at the scene.

SEE MORE: Firefighters Avert Disaster as Fire Guts Laundry Shop in Kwara

The spokesperson for the Kwara State Fire Service, Hassan Adekunle, disclosed this in a statement on Saturday.

Adekunle said the fire service immediately deployed two fire appliances after receiving the distress call, while personnel of the Federal Fire Service later joined the operation.

According to him, the combined effort of the firefighters prevented the fire from spreading to other shops and nearby properties.

“Despite the prompt intervention of the firefighters, 12 shops were affected, largely due to the late notification of the incident,” Adekunle stated.

He said preliminary findings suggested that a power surge might have triggered the fire.

Adekunle explained that some people sleeping near the shopping complex reportedly heard a loud combustion sound shortly after electricity was restored.

“The exact cause of the incident remains subject to further investigation,” he added.

The Chief Fire Officer, Alabi Muhammed, commended the firefighters and the Federal Fire Service for their response and collaboration.

Muhammed urged business owners to ensure that electrical installations were carried out by qualified professionals and that electrical appliances and power sources were properly monitored.

He also stressed the need for residents and business owners to report fire outbreaks promptly.

“Early notification gives firefighters a better opportunity to contain incidents before they escalate and cause extensive damage,” Muhammed said.

The incident occurred just two days after another fire outbreak affected a residential building behind the Industrial Training Fund in the Asa-Dam area of Ilorin.

The Thursday fire affected three bedrooms in a building comprising three-bedroom flats and a room-and-parlour self-contained apartment.

The Fire Service said the blaze had spread significantly before firefighters arrived but was eventually contained, preventing it from reaching an adjoining block of apartments.

A power surge was also suspected in that incident, although the exact cause had not been conclusively established.

The Kwara State Fire Service consequently urged residents and business owners to regularly inspect and maintain their electrical installations and immediately alert emergency responders whenever a fire outbreak occurs.

Continue Reading

NEWS

‘Sambisa Forest Is as Big as Belgium’ — Defence Minister Reveals Why Kidnap Victims Are Hard to Rescue

Published

on

The Minister of Defence, General Christopher Musa (retd.), has revealed that the vast size of the Sambisa Forest is one of the major factors making it difficult for security forces to quickly rescue Nigerians kidnapped by terrorists.

Musa disclosed this during an interview on Channels Television’s Politics Today, where he discussed the Federal Government’s efforts to tackle terrorism and kidnapping in the country.

According to the minister, security agencies have continued to rescue abducted Nigerians, but terrorists often escape into large forest areas before troops can locate them.

SEE ALSO: How Troops Forced Kidnappers to Abandon Abducted Army Lieutenant Colonel in Enugu

“Few ones now, efforts have been made. If you notice, on a daily basis now, we are really getting, rescuing a lot of them,” Musa said.

He explained that the enormous size and difficult terrain of the Sambisa Forest give terrorists an advantage after carrying out attacks.

“So this government is overwhelmed. Sambisa Forest is as big as Belgium, as a country. So when people talk about this, they make it look as if it is one small football field and we are refusing to do anything,” he said.

Musa said kidnappers can disappear into the bush before security agencies receive information about an abduction, making it difficult for troops to determine their exact location.

“These places are massive areas. The forest within Kwara comes in from Burkina Faso to Benin Republic into Nigeria and flows through all these things,” he said.

“So what they do is that once these abductions are done, before the information gets to anybody, these guys are already into the forest.”

The Defence Minister explained that troops sometimes have to cut off terrorists from their usual routes and sources of supplies before they can rescue their victims.

He cited a recent operation in Kwara State, where security forces rescued victims after restricting the movement of their abductors.

“And then the last one that was done in Kwara State, we had to quarantine where they were going, deny them oxygen, and that’s where we were able to get them,” Musa said.

He added that terrorists sometimes abandon their captives when security forces increase pressure on them, providing troops with an opportunity to rescue the victims.

Musa also disclosed that authorities were monitoring financial transactions linked to criminal activities, noting that ransom payments could provide useful information for tracking kidnappers.

He said the Central Bank of Nigeria was also involved in efforts to monitor suspicious funds connected to criminal activities.

The minister further advised state governors to exercise caution when distributing motorcycles as palliatives, warning that some of the vehicles could eventually fall into the hands of terrorists and improve their mobility.

Musa maintained that despite the challenges posed by Nigeria’s vast forests and difficult terrain, security forces were making progress in the fight against terrorism and kidnapping.

Continue Reading

NEWS

Uber Exit: FAAN Reveals Shocking Complaints Against E-Hailing Drivers

Published

on

The Federal Airports Authority of Nigeria (FAAN) has revealed a series of complaints it received from passengers about their experiences with e-hailing and car-hire drivers at Nigerian airports.

FAAN Managing Director, Olubunmi Kuku, disclosed this on Friday while speaking with journalists at the airport amid controversies surrounding the reported exit of Uber from Nigeria.

Kuku said the complaints were particularly numerous during the December 2025 holiday period, when passengers reported having unpleasant experiences with some e-hailing and car-hire services.

SEE MORE: FAAN Clears Air on Bolt, Uber Suspension, Says Services Will Resume

“We received a lot of complaints, especially around the December holiday period, from passengers who used some of the e-hailing services, as well as car-hire services, and had very unpleasant experiences.”

According to the FAAN boss, the complaints reportedly included intimidation, excessive fares and cases where passengers were allegedly dropped off at unintended locations.

She further alleged that some e-hailing drivers were exploiting the airport transportation system by operating alongside car-hire operators and charging passengers higher fares.

“We also had situations where some Uber and Bolt drivers would get out of their cars under the guise of coming into the airport as e-hailing drivers, and then join the car-hire operators to charge higher fares.”

Her comments come weeks after FAAN temporarily stopped e-hailing drivers from conducting commercial passenger pick-ups at airports under its control, pending the finalisation and execution of licensing agreements.

The move generated criticism, with some observers alleging that the restriction was intended to create room for FAAN’s newly introduced Airport Car Hire and Ride Management System (ACHRAMS).

However, Kuku said FAAN’s decision to regulate airport car-hire services was aimed at protecting passengers and improving their overall experience at Nigerian airports.

She explained that the authority had introduced an application designed to provide passengers with visibility on registered car-hire companies and the identities of drivers taking them from the airport to their destinations.

Kuku also clarified that FAAN does not collect fares on behalf of drivers, noting that the rates displayed on the platform are only indicative.

She added that passengers remain free to choose between pre-booked car-hire services and e-hailing platforms, while FAAN’s responsibility is to ensure visibility, safety and accountability within the airport environment.

On Uber’s reported exit from Nigeria, Kuku said the decision was a business and regulatory matter for the company.

“I work for the Federal Airports Authority of Nigeria, and my first responsibility is to ensure that our passengers are safe, protected, and have a seamless passenger experience.

“Regarding Uber, I can’t speak to their exit from Nigeria. I’m sure they have their own economic and regulatory considerations as to why they chose to exit.”

Continue Reading

Copyright © 2022. Biztellers, powered by Alphaxristi.