Connect with us

Business

NCDMB Maintains Excellence Streak, Retains Top Position In Efficiency, Transparency

Published

on

The Nigerian Content Development and Monitoring Board (NCDMB) has retained its position as the best Federal Agency in transparency and efficiency in business, continuing the streak of excellence in the delivery of its mandate.

This was contained in a statement from the corporate communications department of the Agency on Monday.

In the H1, 2023 Executive Order 001 Compliance Ranking, which covered from January to June 2023, the NCDMB scored 83.06 percent to clinch the top position in the Federal Government’s ranking of Ministries, Departments and Agencies (MDAs).

The statement noted that NCDMB was clinching the award for, the second straight year.

The report was released on Monday, and it builds on the Board’s sterling performance in 2022 during which period it had equally emerged the top performer in the whole year, the statement added.

It read, “The Executive Order 001 (EO1) Compliance Report is compiled by the Presidential Enabling Business Environment Council (PEBEC) is determined by a combination of the weighted scores for efficiency and transparency directives.

“Issued on 18 May, 2017 by former President Muhammadu Buhari, the EO1 on the Promotion of Transparency and Efficiency in the business environment seeks to facilitate entrenchment of policies and practices that would foster an environment conducive to business, particularly start-ups, by eliminating bottlenecks.

“PEBEC explained that an “MDA’s EOI overall performance is a combination of scores on the Efficiency and Transparency measures weighted at 70 per cent and 30 per cent of the overall score respectively.”

It added that “the top performing MDAs differentiate themselves by achieving a balanced performance on both the Efficiency and Transparency scales….”

Under Efficiency, the agency’s adherence to its service delivery timelines is key. For Transparency, the chief consideration is existence and functionality of websites, as well as availability of detailed information on timelines, costs, statutory requirements and customer service contact channels. In combination, these would eliminate abuses in the system, including rent-seeking activities.

This latest award follows NCDMB’s emergence as “a Level 5 Platinum Level organisation” in a summary report of the Bureau of Public Service Reforms (BPSR) Self-assessment Tool (SAT) released in January 2023, a rating which translates as “Exceptional Performance with a performance level of 90.5%.”

This accomplishment underscores NCDMB’s unwavering dedication to creating an environment conducive to local and international businesses as well as putting in place initiatives aimed at streamlining processes, reducing bureaucratic bottlenecks, and ensuring that businesses in Nigeria can operate freely.

4 Comments
0 0 votes
Article Rating
Subscribe
Notify of
4 Comments
Oldest
Newest Most Voted
Inline Feedbacks
View all comments
เน็ตบ้าน ais

543111 65671An attention-grabbing discussion is worth comment. I believe that you ought to write far more on this matter, it wont be a taboo subject even so normally persons are not sufficient to talk on such topics. To the next. Cheers 811840

ขายพาเลทพลาสติก

339248 308072Hey! Good stuff, please keep us posted when you post something like that! 559701

check my reference
7 months ago

411345 86719You recognize, a lot of persons are looking around for this info, you can aid them greatly. 994467

Lazywin888
7 months ago

624301 298094Spot up for this write-up, I seriously believe this site needs a good deal much more consideration. Ill apt to be once a lot more to learn additional, appreciate your that info. 691835

Business

Again, Aradel Shifts Results Release Forward

Published

on

After failing to meet its previously announced May 29, 2026 target, Aradel Holdings Plc has extended the filing and publication deadline for its 2025 audited financial statements and first-quarter 2026 unaudited financial statements.

This was detailed in a notice to the Nigerian Exchange Limited (NGX), shareholders and the investing public, which had it that both reports will now be released on or before June 19, 2026.

The company blamed challenges arising from the consolidation of its recently acquired additional 40 per cent equity interest in ND Western Limited.

Aradel had earlier informed the market on March 2, 2026, that the delay in filing its financial statements was linked to the acquisition and had subsequently indicated that the reports would be released on or before May 29, 2026.

ALSO READ: Sahara Group Urges Intra African Investment Push Through “Deliberate TRIPS” at ARDA 2026

Explaining the latest postponement, the company said unforeseen complexities emerged during the consolidation process following the integration of the newly acquired stake into the Group’s reporting framework.

According to the notice, “The delay is due to unforeseen complexities encountered in the consolidation process arising from the integration of the newly acquired interest in ND Western Limited into the Group’s reporting framework. Additional time is required to ensure that the consolidated results fairly present the financial position of the enlarged Group in line with applicable accounting standards and regulatory requirements.”

“The Company is working closely with its external auditors to complete the process without compromising the quality, accuracy or integrity of the financial statements. Both the FY 2025 Audited Financial Statements and the Q1 2026 Unaudited Interim Financial Statements will now be released on or before 19 June 2026,” Aradel said.

The extension means the company’s closed period, which commenced on January 1, 2026, will remain in effect until 24 hours after the financial statements are released to the market. During the closed period, insiders and other restricted persons are prohibited from trading in the company’s shares.

The company noted that trading in its securities by affected persons would resume after the expiration of the extended closed period. Aradel further reiterated its commitment to regulatory compliance and transparency in its financial reporting.

Continue Reading

Business

Savannah Energy Posts Strong Four-Month Performance

Published

on

Ahead of its Annual General Meeting (AGM) billed for June 1, 2026, Savannah Energy, has provided a trading update on its Nigerian operations and other markets in Africa for the four months to April 30, 2026, reflecting continued operational progress and a strong focus on cash discipline.

It reports that following the completion of the SIPEC Acquisition in March 2025, the production expansion programme underway at its Stubb Creek has delivered an 8% increase in average gross daily production to 3.1 Kbopd for the period, compared to 2.8 Kbopd during the same period in 2025.

Its group average gross daily production for the four-month period stood at 15.7 Kboepd (FY 2025: 18.8 Kboepd) with gas production volumes constrained as a result of the ongoing drilling and operational activity, and customer gas demand.

The update shows that its Revenues increased by 17% year-on-year to US$104.1 million, compared to US$89.1 million in the same period last year. It also shows that its trade receivables balance declined by 22% to US$395.2 million from US$507.2 million at year-end 2025.

It also reported cash balances of US$64.7 million during the four-month period, compared to the 31 December 2025 figure of US$42.8 million, with its net debt standing at US$641.7 million compared to the 31 December 2025 figure of US$658.6 million.

According to the update, Savannah’s cash collections for the four months ended April 30 amounted to US$183.5 million, a 48% increase from the US$89.1 million it received during the same period in 2025.

Savannah also reported that it has entered into a new £32 million unsecured loan facility with NIPCO plc, its largest shareholder. The facility is structured in two tranches: £20 million available immediately and £12 million available from July 1. The loan carries a 4.5% annual interest rate and has a 36-month term.

The facility includes a conversion option that allows Savannah to repay the loan through the issuance of new shares at 8 pence per share. NIPCO cannot require conversion, and Savannah is under no obligation to issue shares. The transaction constitutes a related party transaction under AIM rules.

ALSO READ: NNPC Ltd Posts N481bn Profit

The report highlighted the operational progress being made across key African assets, including Uquo and Stubb Creek, as well as continued advancement of its wind, solar and hydropower projects. It reports that drilling and completion activities at the Uquo NE well location have now been concluded, with rig-down operations currently underway ahead of mobilisation to the next well.

It also reports that the flowline installation is in its final stages, with tie-in activities ongoing at the Uquo CPF, while tie-in works at the well pad are expected to commence shortly, with first gas targeted for early July 2026, supporting the higher forecast gas production expected in H2 2026. Site construction activities at the Uquo South exploration well location, it said, are progressing well, with the site expected to be ready by early June 2026, just as conductor piling operations are also ongoing in preparation for the rig move from the Uquo NE location.

In Niger, Savannah reports that its Parc Eolien de la Tarka project has made significant progress to date, with the Minister of Energy confirming that the project is on the Government’s list of priority projects. It expects the timing and sequencing of further development activities in relation to the project to be linked to the timing and outcome of the Company’s ongoing discussions with the Government of Niger regarding the R1234 PSC and the potential recommencement of oil activities.

In Cameroon, negotiations with the Government are at an advanced stage regarding a Joint Development Agreement for the up to 95 MW Bini, a Warak hybrid hydroelectric and solar project. This is expected to replace the Memorandum of Agreement signed in April 2023 and secure the terms under which Savannah will collaborate with the Government of Cameroon to further develop the project.

Andrew Knott, CEO of Savannah Energy, said: “Savannah continues to deliver against the nine core focus areas we set out for the business at the start of 2025. In Nigeria, we have seen a significant improvement in cash collections, with a 48% year-on-year increase in the first four months of the year, alongside a 17% year-on-year increase in Revenues and a 22% reduction in our trade receivables balance since year-end 2025. This reflects our ongoing focus on disciplined cash collections and receivables management, which remains a key priority for the business this year.

“Operationally, we are advancing a number of important projects, including the drilling of two new gas wells at the Uquo field, and the production expansion programme at Stubb Creek which has already delivered an 8% increase in average daily production (compared to the first four months of 2025). In our power division, we continue to progress our greenfield wind, solar and hydro portfolio.

“Alongside this, we continue to pursue further value-accretive acquisitions across both hydrocarbons and power, with several opportunities under active discussion. We are also pleased to have secured a new £32 million loan facility from NIPCO plc (“NIPCO”), our largest shareholder, strengthening our financial flexibility and further underpinning our confidence in delivering continued operational, financial and strategic progress through 2026 and 2027.”

Continue Reading

Business

Dangote Refinery Cuts Petrol, Diesel Prices Again

Published

on

In a move reinforcing its commitment to making refined petroleum products more affordable and supporting economic activities across Nigeria, the Dangote Petroleum Refinery & Petrochemicals has announced a fresh reduction in the ex-depot prices of Premium Motor Spirit (PMS) and Automotive Gas Oil (AGO).

Under the latest price adjustment, the refinery reduced the ex-depot price of PMS, commonly known as petrol, to N1,250 per litre from N1,275 per litre, while the price of AGO (diesel) was cut to N1,700 per litre from N1,800 per litre.

The price review comes amid the refinery’s continued efforts to improve supply efficiency, deepen domestic refining, and provide cost relief to consumers and businesses that depend heavily on petroleum products for transportation, power generation and industrial operations.

ALSO READ: Tinubu Orders Nationwide School Security Overhaul After Fresh Wave of Abductions

Since commencing operations, the 650,000 barrels per day refinery has increasingly supplied the domestic market with refined products aimed at eliminating the country’s dependence on imported fuels.

Continue Reading

Copyright © 2022. Biztellers, powered by Alphaxristi.

4
0
Would love your thoughts, please comment.x
()
x